Minutes of the CLIC Meeting - 1 September 2003


Agenda:
Status of CARE/ESGARD, Status of CARE/JRA3
Speakers:
Gilbert Guignard, Louis Rinolfi


Guilbert presented the status of CARE/ESGARD.
Abstract:
General results of the evaluation by the EU experts of the FP6 R&D Infrastructure proposals; outlines and results of the CARE project on Accelerator R&D, which was accepted; consequences of the recommendations and funding limitations by the EU Commission and next steps.
copy of his transparencies (pdf format)

Louis presented the status of JRA3 (Joint Research Activity 3) about the charge production with photo-injectors (PHIN). He discussed the results of the evaluation by the EU referees. The participation of the involved laboratories was shown with special emphasis for the CTF3 photo-injector.
90% of the requested budget is now funded by the EU with funds available beginning of 2004. A set of project milestones was defined. PHIN makes it possible to build a photo-injector for CTF3 in collaboration with CNRS-Orsay and CCLRC-RAL in the time scale of three years. CERN contributes a total of 1448 k€ (mainly 4 man-years over 3 years), with 1162 k€ to be reimbursed by the CARE budget. In 2007, the CTF3 photo-injector should be operational.
copy of his transparencies (pdf format)
Together with the 1.2 MSFr additional CERN funding granted by the DG for the 1.5 GHz broadband klystron, this opens the two options for the photo-injector and the thermionic injector with subharmonic buncher (SHB). The latter will be operational two years earlier than the photo-injector. Nevertheless, the photo-injector should be the more interesting long-term option for CLIC.