Minutes of the CLIC Meeting - 9 December 2005
Agenda:
Plans for EUROTeV Beam Instrumentation R&D
Speaker:
Lars Soby
Abstract:
The aim of this talk is to present the plans and progress on two of the EUROTeV WP5 R&D projects:
- a 4 mm aperture Precision Beam Position Monitor (PBPM) which should have a resolution of 100nm and an absolute precision of 10μm.
- a Wide Band Current Monitor where the aim is to further develop an existing 7GHz Wall Current Monitor (WCM) in order to obtain > 20GHZ bandwidth.
copy of
Lars
's transparencies (
pdf
format)
Back
to the CLIC meeting Home page
Frank Tecker
- Last updated 12-12-2005