Minutes of the CLIC Meeting - 10 February 2006
Agenda: |
Results from CTF3 Beam Operation and Commissioning in 2005 |
Speakers: |
R. Corsini, S. Döbert, C. Welsch |
Significant
progress
has been made in CTF3 during 2005. After some initial difficulties,
beam operation for 30 GHz production has reached the stage of routine
practice. Promising results have been obtained as well in the
commissioning of the newly installed delay loop and sub-harmonic
bunching system, with the first proof of bunch phase coding and beam
recombination. The main results as well as some relevant beam dynamics
and beam diagnostics issues are presented and discussed.
After recapitulating the status of 2004, Roberto gave an overview of the
operation in both running periods of 2005. He showed in particular the
commissioning of the delay loop and the obtained results of the bunch
recombination.
copy of Roberto's transparencies (pdf format)
Steffen
presented the operation in the PETS mode, stability studies and wall
current monitor measurements of the 1.5 GHz bunched beam.
copy of Steffen's
transparencies (pdf
format)
Carsten
showed the beam instrumentation results and the planned installations.
copy of Carsten's
transparencies (pdf
format)