CERN - European Organization for Nuclear Research

Minutes of the CLIC Meeting - 24 February 2006


Agenda:
Beam Dynamic Issues at the CTF3 Linac and Delay Loop
Some Results on CTF3 Beam Instrumentation
Speakers:
Peter Urschütz, Thibaut Lefevre


Abstracts


Beam Dynamic Issues at the CTF3 Linac and Delay Loop

The talk will address different beam dynamic issues concerning both the CTF3 Linac and the Delay loop. The results of the emittance measurements performed during the last run will be presented and compared to simulations.
The second part will deal with the analysis of the delay loop settings used in operation and the measurements performed during the delay loop commissioning. Additionally, the recently discovered “injection problem” into the delay loop will be discussed.

copy of Peter's transparencies (pdf format)

Some Results on CTF3 Beam Instrumentation

The talk will cover bunch length measurement using the 1.5GHz RF deflector, time resolved energy spread measurements comparing results from the slit dump with those obtained from the segmented photomultiplier, and OTR screen performances with emphasis on the problem of measuring large beam sizes. 
copy of Thibaut's transparencies (pdf format)


Back to the CLIC meeting Home page

Frank Tecker  - Last updated  24-02-2006