CERN - European Organization for Nuclear Research

Minutes of the CLIC Meeting - 2 June 2006


Agenda:
Results of last CTF3 run
Speaker:
R.Corsini, F.Tecker, S.Doebert


Abstract
 

The first CTF3 run of 2006, recently concluded, was dedicated to the continuation of both the Delay Loop commissioning and the CLIC accelerating structure tests. In particular, a five pulse train with (almost) nominal beam parameters has been finally obtained after recombination in the Delay Loop. The main results of the run, including beam performances for 30 GHz power production, are discussed and analyzed.


Roberto gave an overview of the last run and presented the main results.
copy of  Roberto's transparencies (pdf format)

Frank presented optics studies and measurements of the Delay Loop path length.
copy of  Frank's transparencies (pdf format)

Steffen showed measurements of the bunch structure and results for the 30 GHz testing.
copy of  Steffen's transparencies (pdf format)


Back to the CLIC meeting Home page

Frank Tecker  - Last updated  13-06-2006