The Fifth CLIC/CTF3 collaboration meeting was held at CERN from 26th
- 27th October 2000. This meeting was dedicated to the CTF3 injector.
SLAC and LAL collaborators, together with CERN people made a review of
the work done on the beam dynamics and on the design of several components.
The latter includes the thermionic gun, the bunching system and the solenoids.
The workshop treated the possibility to increase both the beam current
and the repetition rate. Both have direct consequences on the injector.
A higher beam current would allow implementing a new mode of CTF3 to generate
30 GHz RF power at the end of the Drive Beam Accelerator. A higher
repetition rate would ease the RF conditioning of the 30 GHz accelerating
structures.
The buncher designs being on the critical path will be finished mid-February
2001, while the final injector design will be finished in June 2001.
AGENDA
Thursday 26 October 2000: Building 6/2-004 | PS Large Conference room |
08:00 Welcome coffee | . |
09:00 Overview and status of the CTF3 injector | L. Rinolfi |
09:45 PARMELA simulations + Discussions | F. Zhou |
10:30 Coffee | . |
11:00 PARMELA simulations +Discussions | D. Yeremian |
11:40 Beam Loading issues | R. Miller |
12:00 Status of CTF3/SLAC gun | D. Yeremian |
12:30 Lunch | . |
14:15 Summary of LAL work | J. Le Duff |
- CLIO gun | G. Bienvenu |
- Injector Calculations at Orsay + Discussions | J. Gao |
15:45 Coffee | . |
16:15 CTF3 Buncher status + Discussions | L. Thorndahl |
16:45 Solenoids for the CTF3 injector | L. Groening |
Friday 27th October2000: Building 6/2-004 | PS Large Conference room |
09:00 Higher current and higher repetition
rate:
what would be the consequences on the CTF3 injector ? |
H. Braun |
09:30 Discussions | . |
10:30 Coffee | . |
11:00 Discussions and strategy for the future | L. Rinolfi |
12:00 Lunch | . |
14:00 Conclusion | H. Braun |
15:30 End | . |
See CLIC note 464