Fifth CLIC/CTF3 Collaboration Meeting


The Fifth CLIC/CTF3 collaboration meeting was held at CERN from 26th - 27th October 2000.  This meeting was dedicated to the CTF3 injector.  SLAC and LAL collaborators, together with CERN people made a review of the work done on the beam dynamics and on the design of several components.  The latter includes the thermionic gun, the bunching system and the solenoids.  The workshop treated the possibility to increase both the beam current and the repetition rate.  Both have direct consequences on the injector.  A higher beam current would allow implementing a new mode of CTF3 to generate 30 GHz RF power at the end of the Drive Beam Accelerator.  A higher repetition rate would ease the RF conditioning of the 30 GHz accelerating structures.
The buncher designs being on the critical path will be finished mid-February 2001, while the final injector design will be finished in June 2001.

AGENDA


Thursday 26 October 2000:                               Building 6/2-004 PS Large Conference room
08:00 Welcome coffee .
09:00 Overview and status of the CTF3 injector  L. Rinolfi
09:45 PARMELA simulations + Discussions F. Zhou
10:30 Coffee .
11:00 PARMELA simulations +Discussions D. Yeremian
11:40 Beam Loading issues  R. Miller
12:00 Status of CTF3/SLAC gun D. Yeremian
12:30 Lunch .
14:15 Summary of LAL work  J. Le Duff
                    - CLIO gun G. Bienvenu
                    - Injector Calculations at Orsay + Discussions J. Gao
15:45 Coffee .
16:15 CTF3 Buncher status + Discussions L. Thorndahl
16:45 Solenoids for the CTF3 injector L. Groening

 
Friday 27th October2000:                                  Building 6/2-004 PS Large Conference room
09:00 Higher current and higher repetition rate
          what would be the consequences on the CTF3 injector ?
H. Braun
09:30 Discussions .
10:30 Coffee .
11:00 Discussions and strategy for the future L. Rinolfi
12:00 Lunch .
14:00 Conclusion H. Braun
15:30 End .

 


See CLIC note 464



Nadia Fisher - 27 November  2000