Eighth CLIC/CTF3 Collaboration Meeting


 

The eighth CTF3 collaboration meeting was held at CERN on 30th September and 1st October 2003.  All collaborating institutes participated: LNF (Frascati), LAL (Orsay), RAL (Oxford), SLAC (Stanford) and Uppsala University.  This year a new collaboration partner (North Western University Illinois) participated for the first time.  In addition many CERN groups made important contributions. 

Important results from operation of the Preliminary phase - the bunch combination by a factor of 4 and 5 - were reported, an important proof of principle for the CLIC Drive Beam scheme. 

A highlight of the commissioning of the Initial phase was the successful operation of the accelerating structures with 100 % beam loading with nominal beam parameters.

Impressive progress was reported on all activities.  The design and layout studies are far advanced and very active hardware design and prototyping is going on.  Series production of many components has already started. 

            The major milestones for 2004 are the installation and commissioning of the Drive Beam Accelerator followed by the magnetic chicane and a 30 GHz high power RF test stand in the linac.  For 2005 the installation of the Delay Loop is planned.

AGENDA

Tuesday, 30th September 2003 .Building 40 S2 B-01
   
Morning Session   
Chairman: A. Ghigo  
   
Welcome C. Wyss
Status of CTF3 G. Geschonke
Review of the main results of  the CTF3 preliminary phase F. Tecker
Coffee Break  
2003 commissioning results and conclusions R. Corsini
Gun and pre-bunchers performances R. Roux
   
Afternoon Session  .
Chairman: T. Garvey  
   
a) Photo injector  
Drive beam photo-injector option A. Ghigo
Experience with RF gun in CTF2, Extrapolations for CTF3 H. Braun
Photo-injector laser development / Pilot test / CTF3 design I. Ross
Photocathode performance - design requirements G. Suberlucq
LAL involvement in PHIN/ESGARD T. Garvey
Coffee break  
   
Chairman:  H. Braun  
   
b) Thermionic injector  
Subharmonic buncher at 1.5 GHz for CTF3 L. Thorndahl
Status of Drive Beam accelerating structures and 3 GHz high power loads E. Jensen
Intensity and position monitors L. Sĝby
Beam profile monitors T. Lefèvre
Data acquisition for beam diagnostics M. Gasior
CTF3 machine protection system D. Belohrad

 

Wednesday, 1st October 2003 Building 40 S2 B-01
. .
Morning Session  .
Chairman: A. Yeremian  
   
Status of high power RF for CTF3 G. McMonagle
BOC RF pulse compression system I. Syratchev
RF low level and pulse compression control J. Mourier
Development of a bunch frequency / length monitor for CTF3 A. Ferrari
Beam loss detection system M. Velasco
Coffee break .
   
Chairman: J.P. Potier  
   
Revised optics for the chicane and Delay Loop C. Biscari
The 1.5 GHz RF deflector for the CTF3 delay loop F. Marcellini
Effect of the beam loading in DL RF deflector(s) D. Alesini
Beam diagnostics in Delay Loop A. Stella
Hardware status A. Ghigo
   
Afternoon Session   
Chairman: K. Hübner  
   
High power 30 GHz testing with CTF3 W. Wuensch
30 GHz RF power production in CTF3. Technical aspects and status I. Syratchev
What can we learn for CLIC? R. Corsini / D. Schulte
Coffee break  
Concluding remarks J.P. Delahaye/G. Geschonke


                        See CLIC Note 580
 


Lydia Ghilardi   -  29th September 2003