Ninth CLIC/CTF3 Collaboration Meeting


 

The ninth CTF3 collaboration meeting was held at CERN from 23rd to 25th November 2004.  All collaborating institutes participated: LAL (Orsay), LNF (Frascati), RAL (Oxford), SLAC (Stanford), North Western University (Illinois) and Uppsala University. 

 On 19th May 2004 a CLIC Collaboration meeting was called by the CERN DG with the aim to widen the collaboration. Work packages were presented to participants with the aim to find partners taking the responsibility for a whole or part of a package. The aim is to establish a collaboration which should allow to answer - by 2009- the major outstanding feasibility issues for CLIC. As a consequence, new potential partners - Ankara University and Gazi University (Turkey), CEA (Saclay) and CIEMAT (Spain) – participated for the first time and presented subjects of a possible collaboration. Many of the proposed topics are, however, still subject to approval by the respective funding agencies.

 In addition, many CERN groups made important contributions.

 The meeting has shown the impressive progress on all activities thanks to a very dynamic collaboration.

 The two highlights from the 2004 commissioning were:

 -     the 30 GHz RF production in the newly installed test stand in the linac and

-     the bunch length manipulation with the chicane installed by LNF.

 The major milestones for 2005 are the installation and commissioning of the 1.5 GHz sub-harmonic bunching system and the Delay Loop, as well as 30 GHz high power RF testing of CLIC accelerating structures.

 The design and layout studies for the future installations (Delay Loop, Photo Injector, CLEX) are well advanced and hardware design and prototyping is continuing. The production of many components is on the way.

 

AGENDA

Tuesday, 23rd November 2004 Building 40 S2 D-01
   
Morning Session   
Chairperson: K. Hübner  
   
Welcome/Status of CLIC J.-P. Delahaye
Status of CTF3, plans, collaboration G. Geschonke
   
Chairperson: A. Ghigo  
   
CTF3 operation 2004/2005  Parts I & II R. Corsini/F. Tecker
INFN chicane and RF deflector C. Biscari
   
Afternoon Session  .
Chairperson:  I. Wilson  
   
Beam line/commissioning H.Braun
30 GHz hardware I. Syratchev
30 GHz accelerating structure test programme W. Wuensch
   
Chairperson:  F. Tecker  
   
Beam diagnostics performance in 2004 and 2005 T. Lefèvre
RF low level system J. Mourier

 

Wednesday, 24th November 2004 Building 40 S2 A-01
.  
Morning Session   
Chairperson: T. Garvey  
   
Layout and general remarks H. Braun
Probe beam design options M. Jablonka
Two beam test stand and TL2 V. Ziemann
   
Chairperson:  H. Braun  
   
CLIC PETS test programme I. Syratchev
Test beam line discussion: Parts I, II,  & III D. Schulte/I. Syratchev
   
Afternoon Session   
Chairperson:   C. Biscari  
   
Combiner ring and TL1 R. Corsini
Magnets for CTF3 T. Zickler
Kickers and septa K.-D. Metzmacher
Ciemat status of technological development L.G. Tabares
Vacuum issues J. Hansen
   
Chairperson: A. Yeremian  
   
General plan and photocathodes G. Suberlucq
RF structure R. Roux
Laser status M. Divall
Safety issues for collaborations G. McMonagle
Beam loss monitoring system A. Dabrowski
   
   

 

Thursday, 25th November 2004 Building 40 S2 A-01
   
Morning Session   
Chairperson:  L. Rinolfi  
   
Sub harmonic bunching system L. Thorndahl
CT Line Installation and Delay Loop Hardware Status A. Ghigo
1.5 GHz RF deflector F. Marcellini
   
Chairperson: : R. Corsini  
RF power G. McMonagle
Planning conclusion L. Rinolfi

 


                            CLIC Note 619
 


Lydia Ghilardi   -  29th November 2004